For Mammoet
Concrete Mounting / Dekker Werkendam a Terex PPM Super-Stacker for mounting of
the prefab-elements on underground garage has been rented out.
The machine
had been lifted by a Demag Tele crane of Mammoet in two parts and was completed
at the jobsite. In two parts because of transportation of Stackers is only
possible so as of the dimensions of the complete machine are to big for normal
height of 4.00 m on Dutch roads.
The
elements up to 16 ton were placed and transported both by the crawler crane and
the stacker.
Instead of 6 months the work was finished in just over 3 months. The
lifting tools for the elements had been developed by Mammoet.
Mounting
concrete prefab at Central Station, the Haque.
Tools for the concrete parts.